Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
huge
Model Number:
HSW0704
Frame Material:
Aluminum Alloy
Open Style:
Fixed
Type:
Fixed window
Name:
Aluminum fixed panel window with double insulated glazing
Profile:
Aluminum Alloy (including 6063-T5)
Thermal break/Standard:
Warranty 10 years
Glass type:
Single Glass/double glass/Low-E,etc
Glass:
standard/thermal break
Hardware:
German Brand, Austrilian Brand, China Brand
Finish:
Electrophoresis/Powder Coating/Anodizing/wood grain
OEM color:
30 years total manufacturer
Certificates:
ISO9001/CE/AA/EN/JIS/BSI
Negotiable leading time:
1 PC MOQ
Supply Ability
Supply Ability:
1000000 Square Meter/Square Meters per Month
Packaging & Delivery
Packaging Details
Step 1. Put protective tape to protect frames from scratches
Step 2. Keep products fixed on pallets
Step 3. Tie products on the pallets with plastic belts
Step 4. PE films keep windows away from sea water
Step 5. Air bags to be filled between each pallet to keep it steadily
Port
Guangzhou
Lead Time :
Negotiable
Product Description
General Matrix
Frame | Thermal Break | Top-grade thermal break |
Standard non-thermal break | ||
Thickness | 1.2-2.0mm thickness for windows | |
2.0-2.5mm thickness for windows and doors | ||
2.5-3.0mm thickness for glass curtain wall and glass house | ||
Finish | Powder coating, Anodized, electrophoresis, wood grain, etc | |
Colors | All colors available but their finish will be different | |
Dimension | OEM,ODM factory direct price | |
Glass | Colors | All colors available but their finish will be different |
Glass Tpye | Single Glass, double glass, triple glass, Quadruple glass,laminated glass, etc | |
Hardware | China top quality hardware (10 years warranty, German brand, Australian brand | |
Package | Step 1. Put protective tape to protect frames from scratches | |
Step 2. Keep products fixed on pallets | ||
Step 3. Tie products on the pallets with plastic belts | ||
Step 4. PE films keep windows away from sea water | ||
Step 5. Air bags to be filled between each pallet to keep it steadily | ||
Leading time | about 25 working days, depending on order's quantity |
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer