Drawing Type:
I want to get Architecture Schematic Design Floor Plan, Elevation, Section, Renderings
Design Description:
PROJECT: "DREAMED HOSTEL" – 2-storey, 12-room self-contained hostel
1. LAND: Family-held leased land of 0.16 acre (approx. 647 sq.m,
~26.5 m x 21.8 m) at Brahabobom, Apinto Division, Tarkwa-Nsuaem
Municipality, Western Region, Ghana, fronting an access road.
Stool lease of 50 years (granted 2019); approved survey plan
attached; registration and hostel-use consent are being completed
with the Lands Commission and the Apinto stool.
2. BUILDING: 2-floor hostel, approx. 423 sq.m total floor area,
footprint 17.4 m x 12.15 m.
- Ground floor: 6 self-contained single rooms, each with
kitchenette, bathroom and private lobby; central corridor;
waiting area; porter's lodge; store; WC; main entrance.
- First floor: same 6-room arrangement repeated, plus an open
front terrace/balcony for tenants.
3. STYLE & FINISH: Simple modern. Clean rendered facade with a
contrasting accent band between floors, hipped roof in brown
aluzinc, cross-ventilation windows on all four facades, entrance
canopy on columns, burglar-proof openings on ground floor.
2-Star level finishes (durable, low-maintenance, easy to clean).
4. SERVICES TO INCLUDE: Overhead water storage tank on tower at
rear corner (gravity feed), septic tank and soakaway at rear,
paved forecourt, boundary fence with sliding gate, surface
drainage.
5. SITE CONSTRAINTS: Plot is small (647 sq.m) and slightly
skewed – please respect the building lines shown on the attached
concept site plan, keep the septic/soakaway at the rear, and
maintain the open yard for laundry/drying.
6. DELIVERABLES NEEDED: Site plan, ground & first floor plans,
all elevations, one section, door/window schedules, basic
plumbing & electrical layouts, 3D exterior views — a complete
set suitable for building permit submission to the
Tarkwa-Nsuaem Municipal Assembly, Ghana, and for a local
licensed architect to finalize and stamp.
7. BUDGET & TIMELINE: Design budget approx. USD 500 MAX
(fixed fee preferred, milestone payments). Construction budget
approx. USD 140,000–180,000. I want to start construction within
3–4 months, so please state your delivery timeline in your proposal.
View More
Comments
Feedback from Buyer