Project Background
The project site is located on the southeast side of the new Nanjing North Railway Station, only a 3-minute drive from the North Railway Station. The unique geographical advantage brings convenient transportation and potential opportunities to the project. It takes half an hour from the land to reach Chuzhou, Yangzhou and other metropolitan areas: it takes one hour to reach Hefei, Bengbu, Huai'an, and enter Shanghai's close business circle in two hours; it can reach distant areas such as the Bei
Master Plan Renderings
1. All commercial, office and apartment buildings are sold and not self-owned;
2. The ground commercial area shall not exceed 2 floors, and the commercial area shall be maximized while meeting planning requirements;
3. The office building shall be reserved for the possibility of being converted into an apartment;
4. The underground garage shall not exceed 2 floors, and the underground commercial area shall be maximized while meeting the parking requirements;
Master Plan
The project site is surrounded by convenient transportation, with mature bus and subway stations. There are bus stops close to the project on Wenjing Road and Huoju Road. Metro Line 3 passes along Wenjing Road, and the Dongda Chengxian College Station is located on the south side of the base.
Exterior Renderings
People's view along the street
Floor Plan
building layout
Elevation Plan
Architectural elevation
Section Plan
Building section
Comments
Feedback from Buyer