Project Background
This project is a new factory for the company CMIC, which manufactures construction materials in Douala. The building is 12 meters high at the columns and reaches 15 meters at the ridge. It is divided into several zones, including storage areas, processing zones, and loading areas
Scheme Design
The structural analysis was carried out using Robot Structural Analysis 2019. The wind region considered is Wind Region 2, snow load was not applied, and the design standard used is Eurocode 3
Renderings
The construction site area is not yet inhabited, so there are no surrounding buildings
Seismic Design
not susceptible to earthquake