Project Background
Need a place for him self and need place to rent like boarding
Architectural Construction Drawings - Building Construction
Konstruksi bangunan untuk bantalannya menggunakan gelondongan beton dengan bantalan batu kali sebagai penyangga sloef, sloef, kolom, balok, dan ringbalk menggunakan beton K.250, sedangkan kontruksi rangka atap menggunakan struktur baja ringan zincalume dengan penutup UPVC Alderon
Floor Plan
The room plan follows a structural grid pattern, and because of the shape of the land and buildings, it is latched to avoid building cracks and to save structure
Elevation Plan
It is a 02-storey building with a ground floor level elevation of 70cm from the original land which is level with the road level
Section Plan
A sectional drawing of the building showing the structure of the building and its elevation
Architectural Renderings(Drawing/Photo)
The front of the building is still on the 01st floor with development plans for the 02nd floor
Architectural Construction Drawings - Structural Construction
Construction drawings are structural plans and details, however they are still planned holistically
Seismic Design
The location of the building is located on a path that rarely or never gets too strong an earthquake
Design Basis and Overview
Structural design using existing standards
Main Characteristics of Construction Project
The stiffness of the elements/structures is the only characteristic used in static problems, while the other characteristics, namely mass and damping, are not used.
Energy Saving Design Specification
For water sources using PDAM and electricity sources using PLN
Green Building Design Specification
The green building application is applied to the parking floor which uses grass block K.400. The fence functions as a vertical garden, while dirty water and rain water are made to impregnate, solid dirty water uses a biophilic septic tank, so the output is water that is suitable for disposal.
Prefabricated Building Design Specification
In this building all concrete structures do not use pre-fabrication, formwork is directly installed in place, as well as concrete directly cast in place
Comments
Feedback from Buyer