Project Background
Main Entrance – Campestre S.A.E. “Dry Port & Customs Terminal”
Aerial view of Campestre S.A.E.
Master Plan Renderings
The project consists of an interconnected two-building complex: Trade Center Ciudad del Este, Hotel Casino & Golf Club, and the Manuel Ortiz Guerrero Opera House.
• Hotel Casino: 180 rooms (Standard, Suite, and Presidential Suite).
• Trade Center: Over 150,000 m² of space featuring retail shops, food courts, a movie theater, gaming areas, and various other attractions.
• Manuel Ortiz Guerrero Opera House: This ambitious theater aims to honor the cultural legacy forged by the artist—specifically
Corporate Buildings
Main 5-Star Hotel Facade or Entrance
5-Star Hotel & Golf Club
Commercial Building & Logistics Center
Aerial view of Commercial Building & Logistics Center
Master Plan
The project consists of an interconnected two-building complex: Trade Center Ciudad del Este, Hotel Casino & Golf Club, and the Manuel Ortiz Guerrero Opera House.
• Hotel Casino: 180 rooms (Standard, Suite, and Presidential Suite).
• Trade Center: Over 150,000 m² of space featuring retail shops, food courts, a movie theater, gaming areas, and various other attractions.
• Manuel Ortiz Guerrero Opera House: This ambitious theater aims to honor the cultural legacy forged by the artist—specifically
Exterior Renderings
Corporate Building Views 1
Corporate Building Views 2
Corporate Building Views 3
Floor Plan
Floor plans.
Elevation Plan
Elevation plans.
Section Plan
Section plans.
Comments
Feedback from Buyer