Project Background
THE MODERN IMM KH COMPLEX BUILDING DESIGN
This office building in Lac 3, Tunis, now completed, began with deep excavation and solid foundation works, laying the groundwork for a modern landmark in the district.
Exterior Renderings
This contemporary office building blends minimalist geometry with sleek urban presence. Its design features a striking contrast between a glazed curtain wall faade and a rhythm of vertical windows on a solid mass, emphasizing transparency, light, and efficiency. The project integrates ground-level retail spaces that activate the street edge, while upper floors provide flexible office layouts with abundant daylight and views. Positioned in the dynamic district of Lac 3, the building reflects mod
Active ground floors animate the street, while upper levels offer calm, light-filled spaces overlooking the city’s movement below.
Floor Plan
Rez-de-chausse (Ground Floor): Welcomes users with a reception area, meeting rooms, offices, and support facilities, establishing the building’s public face
(Basement): Dedicated to parking, technical rooms, and service areas, ensuring functionality and efficient circulation.
(First Floor): Flexible coworking spaces, offices, and meeting rooms designed for collaboration and productivity.
(Second Floor): Expanded coworking zones and support areas, combining openness with private work settings.
(Third Floor): Additional offices and shared work areas, reinforcing modularity and adaptability for tenants.
(Fourth Floor): A balance of open workspaces and enclosed offices, with optimized daylight and spatial comfort.
(Roof Level): Accessible roof terrace offering technical installations and potential for social or green spaces.
Comments
Feedback from Buyer